Data center Charlie

Installation of a new backup power generator

Location: Stockholm

Scope: Installation of a backup power generator and associated infrastructure.

Duration: 2020

Production: Ongoing

In this project, Fidell plays a central role as the Principal Contractor for Health and Safety (BAS-U), overseeing the installation of a new backup power generator in the basement of a property in Stockholm. The project includes not only the installation of the generator but also the casting of a sound-dampening concrete slab to minimize noise, the attachment of a separate ventilation system, and the installation of cooling units to manage the heat generated by the generator.

The assignment is carried out in an environment requiring high flexibility and consideration for both ongoing operations and nearby residential areas. These conditions place specific and high demands on the role of the Principal Contractor for Health and Safety (BAS-U), where Fidell’s task is to ensure that all work is performed safely and without disrupting daily operations or the residential environment in the area.

Summary of
Data center Charlie

This project is essential for enhancing the building's energy security and ensuring continuous operation in the event of power outages. By effectively coordinating all aspects of the installation, Fidell helps the project meet both technical specifications and safety requirements.

Contact us

In this project, David Bjerkdahl, among others, has been involved.

Are you interested in what we can achieve together? Contact Fredrik Doverot at  070 983 24 04 to explore how we can collaborate and create socially beneficial and sustainable projects together. We look forward to supporting you every step of the way.

Visiting address: Norrtullsgatan 17,
113 29 Stockholm

Phone: 08-96 92 00

Mail: info@fidell.se

© 2024 Fidell